Go To Search
Click to Home
Mission & 2016 Fiscal Highlights
Mission

The Street Department will provide proper maintenance of streets, alleys, drainage
systems, parking lots, snow and ice removal, and assist other departments that
request support. The department is responsible for the maintenance of 173 miles
of streets, 71 miles of alleys, 25 miles of storm water drainage systems, and 22
City drives and parking lots.


2016 Fiscal Highlights
  • Reconstructed 2,400 feet of Airport drainage channel by reshaping the channel and removing all the trees, vegetation, and 660 yards of debris.
  • Repaired the channel with 75 tons of rip rap and 1,080 cubic yards of soil.
  • Redesigned and replaced the sidewalk at the corner of the Veterans’ Plaza at 4th Street & Grand Avenue.
  •  Reshaped the corner at 4th Street & South Avenue using 34 yards of concrete.
  • Treated 19 miles of streets with the chip and seal process.
  •  Utilized 622 tons of asphalt and 151 yards of concrete to make needed repairs to City streets.
  •  Repaired 489 blocks of alleys, using 632 tons of TBSC oil and 70 cubic yards of asphalt millings.
  • Removed 883 cubic yards of bricks on south Oak for the street reconstruction.
  • Swept 21,854 city blocks, removed 4,677 cubic yards of debris, replaced 967 feet of curb and gutter, and crack sealed 5 lane miles during the current year.
  •  Repaired utility cuts using 330 tons of asphalt and 191 yards of concrete, all completed within 30 days of the utility cut.
  • Assisted in repairs to the Lake Ponca shelter houses.


516 E. Grand, Ponca City, OK 74601
PO Box 1450, Ponca City, OK 74602
Ph. (580) 767-0339
Home : Intranet : Contact Us : RSS : Translate : Site Map : Privacy Policy : Disclaimer : Terms of Use : Accessibility : Feedback : Powered by CivicPlus